![]()
Supplied with electricity, telephone / data, copper and fiber optic, gas connections and water supply, water for fire protection, water for irrigation, sewerage, stormwater drain.
Features of the lots
with gravel with thickness of 40 cm
stabilized with lime or cement to a thikness of 45 cm
leveled and lightly rolled
possibility to build “turnkey” following customer project
Possibility to build “turnkey” following customer project or specific requests